Energy audit to DIN EN 16247 for a manufacturer of vehicle bodies and trailers

Hall heating, compressed air and production equipment at an extensive production site

The client builds trailers and vehicle bodies for cars and trucks. The audit covered a contiguous, leased site with administration, a customer centre, several production halls, and storage and shipping areas.

Production hall with ventilation ducts and continuous-row lighting in vehicle manufacturing

Audit type

Energy audit to DIN EN 16247-1 under sections 8 et seq. EDL-G

Industry

Vehicle manufacturing: car bodies, vehicle bodies and trailers

Site

One leased site with administration, production halls, storage and shipping

Energy carriers

Natural gas and electricity, fuels assessed at a higher level

Why energy efficiency matters in vehicle manufacturing

Large production and storage halls have to be heated, usually still with fossil fuels. On top of that come electricity-intensive processes such as cutting, machining, extraction and compressed air generation.

Starting with heat generation and cross-cutting technologies cuts energy costs and CO₂ emissions directly and lays the groundwork for a gradual switch to renewable energy.

What was the focus of the audit?

Allocation of energy consumption to consumer groups

We allocated natural gas and electricity to the consumer groups; hall heating had the largest share. We also evaluated the electricity load profiles and benchmarked the area-related indicators against VDI 3807 reference values.

Heat generatorsMain focus
Hot water
Lighting
Ventilation
Fixed consumers: plant equipment, extraction, compressed air
Portable consumers

Fuels for industrial trucks and the vehicle fleet were assessed at a higher level in line with the 90 % rule.

How did the energy audit work?

From the kick-off meeting to the BAFA submission
  • Kick-off meeting: Define the scope, system boundaries and criteria for assessing measures.
  • On-site inspection: Survey of heat generators and of plant, compressed air, ventilation and lighting systems in buildings and halls.
  • Data collection and analysis: Evaluate bills, load profiles, inventory and floor-area data; model unmetered consumption to VDI 3807.
  • Assessment and report: Derive measures and recommendations, assess cost-effectiveness using the net present value method, point out suitable funding programmes and prepare the energy audit report.
  • Completion and BAFA submission: Online submission to BAFA and closing meeting with the organisation.

What made this audit special?

Conditions that shaped the approach and the result

Extensive site

Numerous halls of different use, construction and age, plus several grid connections, had to be consolidated and assessed individually.

No sub-metering

Electricity and heat were not metered downstream. Allocation to consumer groups was based on modelling, inventory lists and consultation with the plant.

Hall heating

We looked separately at heat losses and load curves caused by large room volumes, door areas and seasonally fluctuating loads.

Ongoing modernisation

The envelope of the leased building was outside the audit scope. Completed and planned measures such as heat pumps, photovoltaics and radiant ceiling panels were included in the assessment.

Extraction system outside a vehicle manufacturing site

Project profile

Key facts of the energy audit
Audit typeEnergy audit to DIN EN 16247-1 under sections 8 et seq. EDL-G
IndustryVehicle manufacturing: manufacture of car bodies, vehicle bodies and trailers
Focus areasHall heating, hot water, production plant equipment, compressed air, ventilation and lighting
Possible additional reviewsLoad profile analysis, energy indicators benchmarked against VDI 3807, cost-effectiveness analysis using the net present value method, review of funding options, assessment of compressed air generation, classification of requirements under EnEfG, EnSimiMaV and CSRD

More energy audits by INOPCO

References from industry, retail, IT and healthcare
Server room with rows of racks in a data centre

IT service provider with data centre

Electricity consumption of servers, air conditioning and offices broken down across two leased sites, with separate indicators for server and office space.

Boiler room with boiler and flue system in a hospital

Healthcare: specialist hospital

Heat supply with a CHP unit, medical equipment and listed buildings at four sites, assessed during ongoing hospital operations.

Energy audit to DIN EN 16247 for a retailer with a nationwide branch network

Retail: nationwide branch network

Multi-site procedure with clustering, a model branch and representative inspections across all sites and energy carriers, including the vehicle fleet.

Energy audit to DIN EN 16247 at a manufacturer of modified starch

Chemicals: modified starch production

Process steam, production machinery and historic buildings in continuous shift operation, with load profile analysis and a review of on-site power generation.

Back to the energy audit to DIN EN 16247 service